CHORE-TIME

HOME  |  ABOUT CTB  |  EMPLOYMENT  |  CONTACT US  |  SITE MAP


Mounting Configuration for Chore-Time's
TURBO-COOL System

Mounting Configuration for Chore-Time's TURBO-COOL™ System

High-Efficiency 6-Inch (152 mm) Cooling Pad

Pad support tray improves pad
support and extends pad life.

Mount system on separate exterior
wall outside of tunnel curtain.

 

High-Efficiency
6-Inch (152 mm) Cooling Pad

  • Industry-preferred, high-performance pad.
  • Standard 45/15 fluting or 30/30 fluting optional.
  • 12-inch (30.5 cm) pad width.
  • Pad heights of 2, 3, 4, 5 or 6 feet (0.6, 0.9, 1.2, 1.5, or 1.8 meters).
  • Standard pad includes black protective coating.
  • Protective bottom coating is optional.
  • Pads are easy to remove for cleaning without hardware or tools.
  • Full-width plastic support tray under pads.

 

Self-draining sump tank

Self-draining sump tank includes reinforcing
ribs for greater strength and durability.

 


For more precise control of cooling,
use the pulsing option available with Chore-Time's CHORE-TRONICS® Control to wet just part of the pad. The CHORE-TRONICS pulsing option also helps to reduce rapid temperature fluctuations.

Back to TURBO-COOL™ Systems

Chore-Time CHORE-TRONICS® Control

CHORE-TRONICS® Controls


Copyright © 1997-2008 CTB, Inc.  |  Phone 574-658-4101  |  Fax 574-658-3471 |  E-Mail - Contact Us  |  Privacy Policy 
INTERNATIONAL E-Mail   |  Online Publications   | 
Info Request  |  Dealer Request
Best viewed with Internet Explorer 4.0 or higher and resolution of 800x600.